Utility Fees  effective january 1, 2024

Fee Description
Fee
Water Entrance Fees*     
Connection Fee (New or increased service connection to public water main)      
Residential $625 per unit
       
Non-Residential:  The equivalent number of units shall be calculated by dividing the design flow       
by 330 gallons per day (gpd) determined using the Sewage System Flow Design flow values of Title 5     
of the State Environmental Code (310 CMR 15)     
           
Tapping Fee (Connection at main, in addition to Connection Fee where applicable)†     
1" Service or less $625
1 1/4" Service $650
1 1/2" Service $750
2" or 3" Service $850
4" Service $1,000
6" Service $5,000
       
Fire Protection Water Tapping Fees Ꞝ    
4" and Smaller Fire Service $350
6" Fire Service $650
8" and Larger Fire Service  $1,000
       
Final Bill, per account
$50.00
Backflow Application Fee, per device
$100.00
Backflow Inspection Fee, per device
$75.00
Backflow Reinspection Fee, per device $50.00
Service Charges:
.
          Turn Water On
$75.00
          Turn Water Off
$75.00
          Turn Water On/Off (within 20 minutes for repairs)
$75.00
          After-hours Turn Water On †
$150.00
          After-hours Turn Water Off †
$150.00
         Water Meter Reading By Request $35.00
          Fire Flow Test
$450.00
New Meter & Meter Replacement (Frozen or Customer Damaged) ‡
.
          5/8" Meter
$490.00
          3/4" Meter
$512.00
          1" Meter
$695.00.
          MXU
$250.00
          1.5" Meter $1,955.00
          2" Meter
$2,210.00
          3 " Meter $2,720.00
          4" Meter $4,395.00
          6" Meter $7,550.00
          8" Meter $11,150.00
.         Fire Hydrant Connection .
          Per Day 
$100.00 APPLICATION FEE & $50/DAY ($250 MIN.) 
. PLUS USAGE
Sewer Entrance Fee
   
1. Single Family Home $1,250 per home
2. Apartment Blocks, Attached Condominiums, Townhouses, etc. $1,250 for First Unit plus 
   $250/Unit for Each Additional Unit
3. Motels or Hotels $1,250 for the First Unit plus
    $50/Unit for each additional Unit
4. Commercial Buildings Greater of a or b:
   a. $0.20/Square Foot of Gross Floor Area
    b. $1,250 Flat Fee
5. Industrial Building § # Greater of a, b, or c
    a. $0.10/Square Foot of Gross Floor Area
    b. $50.00 per 100 Gallons Per day Average Flow
     c. $1,250.00 Flat Fee
Stormdrain Entrance Fee, per connection
$1,250.00





* All materials and labor for taps are the responsibility of the applicant; materials shall be approved by the Public Works Director or their designee.

 † Normal business hours are Monday through Friday, 7:00 am to 3:00 pm, excluding holidays.

Meters > 1" will be purchased by the City and charged to the customer.

§ Fire hydrant connection will be at the discretion of the Public Works Director or their designee.

# Large industrial buildings (>200,000 gross floor area) or large user (>40,000 gpd average daily flow) will be reviewed on a case by case basis for utility connection fees. 

Tapping fees shall correspond to the size of the branch services when a single connection to the main services multiple branched lines. For example, if a 8" connection at the main branches to a 6" fire connection and a 2" domestic connection to the building, the fee would include a tapping fee for the 6" fire connection and a tapping fee for the 2" domestic connection.)